Extremely rare, turnkey facility designed to meet solid dose pharmaceutical cGMP standards, in a strategic western GTA location (Burlington). The building offers a rare opportunity to secure a newly finished, fully functional, state of the art GMP facility, without the typical long lead time required for design, construction, and fit out. Building improvements include clean rooms (to ISO 8 standards), air filtration and air exchange systems, USP grade purified water system, Uninterruptible Power System (UPS) + natural gas backup generator, redundant heating and cooling systems and a building security and automation systems to ensure that all required metrics (temperature, filtration, etc.) are met and adhered to All improvements are +/- 2 years old. The premises previously held a drug license, standard processing license, and a drug establishment license, more details of which can be made available upon signature of NDA by qualified parties including a full list of available equipment. Clear height of the warehouse space: 16′ 6″ from floor to the struts.